Enterasys Enterasys Gold Distributed Forwarding Engine 4G4282-49 Guide d'installation Page 81

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 90
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 80
Matrix DFE-Gold Series Installation Guide B-1
B
Mode Switch Bank Settings
and Optional Installations
Thisappendixcoversthefollowingitems:
Required Tools
Usethefollowingtoolstoperformtheproceduresprovidedinthisappendix:
•Antistaticwriststrap
Phillipsscrewdriver
Setting the Mode Switches
For information about... Refer to page...
Required Tools B-1
Setting the Mode Switches B-1
Memory Locations and Replacement Procedures B-3
Caution: An antistatic wrist strap is required to perform the following procedures
to minimize ESD damage to the devices involved.
Precaución: Para minimizar los efectos de las descargas de electricidad
estática, deberá utilizar una pulsera antiestática al realizar los siguiente
procedimientos.
Caution: Read the appropriate sections to be fully aware of the consequences
when changing switch settings.
Only qualified personnel should change switch settings.
Precaución: Si desea modificar la configuración del interruptor, lea las
secciones correspondientes para saber cuál será el resultado de hacerlo.
Estas modificaciones a la configuración sólo debe realizarlas personal calificado.
Vue de la page 80
1 2 ... 76 77 78 79 80 81 82 83 84 85 86 ... 89 90

Commentaires sur ces manuels

Pas de commentaire