Enterasys SecureStack A2 A2H124-24FX Guide d'installation Page 36

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 82
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 35
Installing the Switch on a Flat Surface
3-8 Hardware Installation
Figure 3-4 Chassis Bottom, Rubber Feet Placement
Guidelines for Flat Surface Installation
Locatetheswitchwithin152cm(5ft)ofitspowersourceandonasurfaceasshownin
Figure 35.
Atemperatureofbetween0°C(32°F)and40°C(104°F)mustbemaintainedatthe
installationsitewithfluctuationsoflessthan10°C(18°F)
perhour.
Ifanoptionalredundantpowersystemisgoingtobeinstalledandconnectedtothe
14pinRedundantPowerSupplyinputconnectorontherearoftheswitch,
refertothe
installationguideshippedwiththeredundantpowersystem.
1 Bottom of chassis as seen when chassis is
resting on its back
3 Rubber feet with adhesive backing
(four)
2 Locations to install the rubber feet (four locations)
Note: If a number of switches are being installed in a stack, repeat steps 1 through 4 to
install the rubber feet on each switch before continuing with the installation.
À
Á
ÂÂ
ÂÂ
Vue de la page 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 81 82

Commentaires sur ces manuels

Pas de commentaire