Enterasys C2RPS-SYS Guide d'installation Page 42

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 80
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 41
Configuring Switches in a Stack
3-14 Hardware Installation
Recommended Procedures for New and Existing Stacks
Installing a New Stackable System of Up to Eight Switches
Usethefollowingproceduretoinstallanewstackofuptoeightswitchesoutofthebox.
Beforeapplyingpower,makeallphysicalconnectionswiththestackcablesasdescribed
in
ConnectingStackingCablesonpage311.
1. Onceallofthestackcableshavebeenconnected,individuallypoweroneachswitch
fromtoptobottom(connectingpowertoaswitchisdescribedinConnectingACand
RPSSYSPoweronpage315).
Iftheswitchesarepoweredonalmostsimultaneously,thesystem willautomatically
selectthe
firstonethatpowersupastheMasterswitchandtheothersasMember
switches.TheswitchesareassignedunitIDsintheorderthattheybecomefully
operational.
YoucancontroltheunitIDassignmentaccordingtothephysicalpositioninastack.
Whenyoupowerupeachswitchand
allowittobecomefullyoperationalbefore
applyingpowertothenextswitch,thefirstonebecomestheManagerandallthenext
switcheswilljointhatstack(regardlessofPriority,FirmwareRevision,orMAC
Address).TheswitchesareassignedunitIDsintheorderthatyoupoweroneach
switch.
2. (Optional)Ifdesired,changethemanagementswitchusingthesetswitch
movemanagementcommandasdescribedintheSecureStackA2ConfigurationGuide.
3. Oncethedesiredmasterswitchhasbeenselected,thecurrentconfigurationwillbe
savedandthestackwillautomaticallyreset.Youmustnowmovetheconsolecableto
thenew
managementunit.
4. Stackmembersotherthanthemanagementunitwillonlyidentifytheirunitnumber
throughtheirconsoleport.
5. Persistentdataonallstackunitscanbeclearedalongwiththecurrentconfiguration
usingtheclearconfigallasdescribedintheSecureStackA2ConfigurationGuide.
Important
The following procedures assume that all switches have a clean configuration from manufacturing.
When adding a new switch to an already running stack, it is also assumed that the new switch is
using the same firmware image version as other switches in the stack.
Note: Once switch IDs are assigned, they are persistent and will be retained during a
power cycle to any or all of the switches.
Vue de la page 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 79 80

Commentaires sur ces manuels

Pas de commentaire